Implementation
Use cases
Our solutions are used in 10 areas – from pharmacy to transport.
See what implementations we used for our clients.
Regional Blood Donation and Hemotherapy Center in Warsaw
Regional Blood Donation and Hemotherapy Center in Warsaw
- Customer Case
The Customer was incurring significant costs of plasma storage in external warehouses. New storage sites have become a necessity. - CoolSystems – implementation of the system
A design was prepared for adaptation of old coal-fired boiler station premises for the purposes of modern plasma storage, with new extra rooms designed for the blood expedition department. - Project results
As a result, 60,000 plasma units capacity storage was developed, together with extra rooms and advanced refrigeration systems.
Regional Blood Donation and Hemotherapy Center in Warsaw
Regional Blood Donation and Hemotherapy Center in Warsaw
- Customer Case
During the full blood sampling process, medical personnel had to dedicate significant time to manual sealing and labeling of drainage tubes. There were instances of misidentification, which could lead to a high risk of error. - CoolSystems – implementation
The Ter 2.0 robot is designed to make the entire process automatic and to ensure zero errors in labeling. - Project results
The Ter 2.0 robot has made the process five times faster while reducing the labeling error rate to nil, thus enabling medical personnel to work more efficiently, safely and conveniently.
Regional Blood Donation and Hemotherapy Center in Gdańsk
Regional Blood Donation and Hemotherapy Center in Gdańsk
- Customer Case
Blood components production was organized in the basement of the building and was extremally manual. Production started to grow and it has become necessary to scale up facility and change the way they work to meet modern requirements. - CoolSystems – implementation of the system
We designed and built up from scratch new wing of a building with the size of 1500 m2. The building was adapted to the production and dispatch of blood components. The heat generated by cooling systems is used to power technical equipment of the building.
- Project results
Three floors Automatic Plasma Storage has become a heart of new building and new blood component production process. It has capacity of 80,000 containers and average access time is 1 min. Innovative solution minimized the number of refrigeration systems and the consumption of electricity has been reduced by 20kW. Now the building is self-sufficient in terms of heating and hot water.
Regional Blood Donation and Hemotherapy Center in Białystok
Regional Blood Donation and Hemotherapy Center in Białystok
Looking for the right
solution for yourself?
Contact us, and let us prepare